St. Croix County · Roads, water and land
The matter is the St. Croix County Highway 2027 Construction Project Update
Seiche first signal 2026-10-14 · Decision was scheduled 2026-10-21 · 7 days of notice
Next step on the record
The next step the record states is 2026-10-21.
What this means
Answers from the record.
Why now
The matter first appeared on the Traffic Safety Commission agenda of 2026-10-21. — show the evidence for this sentence: 1 source
Who decides
decision authority has not been verified in this record.
What could change, and for whom
no decision outcome has been recorded.
What happens next
The next step the record states is 2026-10-21. — show the evidence for this sentence: 1 source
These answers were drafted with AI assistance from the public record and judged claim by claim. Each sentence is bound to cited evidence or an explicit statement about what the record has not verified; open cited answers to inspect their sources. Answers without a source describe the status of the record.
Where it stands
The stages this matter has reached.
- SurfacedOctober 14, 2026
- In committeeOctober 21, 2026
- Comment openNot recorded
- Decision scheduledNot recorded
- DecidedNot recorded
- In effectNot recorded
Stage reached
- October 14, 2026: Surfaced
- October 21, 2026: In committee
Traffic Safety Commission
October 14, 2026October 21, 2026
Each dot is a date the public record holds. Filled dots are confirmed: a meeting recorded as held, or a stage, brief or document with its date. Hollow dots are official dates still ahead. Dashed dots are not confirmed: a date the record only anticipates, or an official date that has passed without a record that the meeting was held. Stage dates are the dates the record earned each stage.
What the record shows
Every record inside this matter.
St. Croix County Highway 2027 Construction Project Update
Posted to the Traffic Safety Commission agenda. The recorded next step, October 21, 2026, has passed with no outcome yet on the record.
St. Croix County Traffic Safety Commission agenda includes Highway 2027 construction project
The St. Croix County Highway 2027 Construction Project Update is an item where this matter appears on a posted meeting agenda.
The item is titled St. Croix County Highway 2027 Construction Project Update. The record carries the date 2026-10-21. Decision outcome not yet recorded in this corpus.
AI helped draft this brief from public records. It was published automatically after checks for accuracy, sources, and current information. Source links and cited spans below show the evidence attached to this version.
How the matter has changed
Every change, in the order it was recorded.
October 15, 2026
This matter was opened from its first record.
October 15, 2026
Stage moved from Surfaced to In committee, earned October 21, 2026.
October 15, 2026
First signal recorded as October 14, 2026.
How we know